Identify the surfaces that matter
Mark the visible face, viewing direction, openings, assembly contacts and surfaces to protect. Distinguish cosmetic requirements from functional dimensions. A photograph may communicate intent, but it does not establish surface roughness or an inspection method. Agree a physical or documented reference and the viewing conditions appropriate to the project.
Anodising and material condition
Record alloy and condition alongside the agreed finish. Review colour and appearance against the approved reference rather than assuming different alloys or batches look identical. Confirm masking and whether critical dimensions are measured before or after finishing. Any coating specification or thickness must come from the project, not an assumed website standard.
Bead-blasting and marking
Define faces to blast and features to protect. For laser or screen marking, approve artwork revision, content, position and reading direction relative to holes and controls. Confirm the process sequence with the finish because the resulting appearance must be evaluated on the actual agreed combination, not as separate isolated samples.
Agree the first-article decision
State whether a first article is required, who approves it, what measurements and photos are recorded, and what permits the remaining quantity to proceed. Where a customer supplies mating components, agree sample transport, handling and the fit-check boundary. A first article is a project approval step, not a certification claim.
Release, deviations and repeat work
Record accepted appearance, drawing revision and any approved deviation. Hold unresolved material, fit or marking questions for written disposition. Retain the reference and inspection conditions for the next order, while reviewing changes to quantity, material, process and destination. No record alone guarantees that a later batch needs no verification.