Register the sample and its role
Identify the part, machine role, mating components and failure or replacement reason. Photograph it with a ruler or caliper for context, while recognizing that an angled photo is not a precision measurement. Agree sample shipment, handling and whether the original must be returned or kept for comparison.
Separate measured facts from unknowns
Mark worn, coated, damaged and apparently unaltered surfaces. Measurements describe the sample's present condition; they do not automatically reveal the original tolerance, material grade or service load. Label uncertain features and request mating-part information instead of filling gaps with an assumed standard size.
Build a reviewable drawing
Establish datums, the controlling unit system and features that affect fit. Record the proposed nominal dimensions and how they were agreed. For mm and inch references, resolve conversion and rounding explicitly. Verify file readability and drawing revision before treating a .dwg, .step, .igs or .pdf as released production data.
Agree a first article or small trial
Decide what the trial must prove: fit, motion, appearance or another defined requirement. Assign the reviewer, measurement method, sample quantity and release criteria. Trial cost and availability are project-specific. Passing one feature or assembling one sample does not establish every material property or operating limit.
Lock changes before a repeat batch
Keep sample observations, approved drawing, material and finish requirements, inspection record and accepted deviations under the project reference. If the interface or process changes, review it before another release. TERUU can coordinate this drawing-to-production work and company QC within the agreed scope without inventing missing original equipment data.